Servers.com is currently experiencing a critical incident affecting Power system and Cooling system (NYC1), which began 2d ago. The vendor's full update timeline is below.
Affected components
Power systemCooling system (NYC1)
Update timeline
- investigating Aug 07, 2026, 11:01 PM UTC
The data center has detected a power disturbance in the listed location. The power feed load has been switched to the generator. Currently, the data center engineers are diagnosing the source of the issue. We will update the status as soon as we get more information.