RIPE Network Coordination Centre incident
Maintenance of RIS MRT data
Maintenance completed on May 28, 2026, affecting RIS (Routing Information Service).
Updates and routing table dumps (bview*) are now generated from our new infrastructure, running on rented bare metal servers. There are no changes to the data, and no action is required on your end. What this means: • Update files dated after updates.20260528.0855.gz are produced by the new pipeline. • Dump files (bview*) dated after bview.20260528.0800.gz are produced by the new pipeline. If you notice any unexpected behaviour, please don't hesitate to reach out.
Affected components
Update timeline
- scheduled May 27, 2026, 08:57 AM UTC
We are performing maintenance on the pipeline responsible for generating MRT dumps and update files. During the maintenance window, new update files will not be published. (This maintenance was originally scheduled for May 27th)
- scheduled May 28, 2026, 08:00 AM UTC
Maintenance will begin as scheduled in 60 minutes.
- in progress May 28, 2026, 09:00 AM UTC
Scheduled maintenance is currently in progress. We will provide updates as necessary.
- monitoring May 28, 2026, 10:03 AM UTC
May 28, 12:03 CEST Verifying - Verification is currently underway for the maintenance items. May 28, 11:00 CEST In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary. May 27, 10:57 CEST Scheduled - We are performing maintenance on the pipeline responsible for generating MRT dumps and update files. During the maintenance window, new update files will not be published. (This maintenance was originally scheduled for May 27th)
- monitoring May 28, 2026, 10:03 AM UTC
Verification is currently underway for the maintenance items.
- completed May 28, 2026, 11:44 AM UTC
Updates and routing table dumps (bview*) are now generated from our new infrastructure, running on rented bare metal servers. There are no changes to the data, and no action is required on your end. What this means: • Update files dated after updates.20260528.0855.gz are produced by the new pipeline. • Dump files (bview*) dated after bview.20260528.0800.gz are produced by the new pipeline. If you notice any unexpected behaviour, please don't hesitate to reach out.
Your product runs on more than RIPE Network Coordination Centre
Add the vendors you depend on and get one message when any of them reports trouble. Free for 3 vendors, no card.