Is Google Cloud down?
Last checked 2m agoNo incidents right now.
Google Cloud is operational right now. Last checked 2m ago; the most recent incident resolved 15d ago.
Real-time Google Cloud status, recent outages, and incident history — pulled directly from Google Cloud's official status page at https://status.cloud.google.com every 5 minutes. Pingoru tracks 8691 Google Cloud services and has captured 3 incidents in the last 90 days (99.98% uptime). Get email, Slack, Discord, or webhook alerts the moment Google Cloud reports a new incident — free for 5 monitors, no credit card.
Recent outages & incidents
Past 90 days- Bare Metal SolutionGoogle Cloud NetApp VolumesVMWare engineeurope-west4Bare Metal Solution (europe-west4)Bare Metal Solution (global)Google Cloud NetApp Volumes (europe-west4)Google Cloud NetApp Volumes (global)VMWare engine (europe-west4)VMWare engine (global)
Timeline · 12 updates
- investigating · Jul 16, 2026, 03:30 AM UTC
Description: GCVE: Our engineering teams are currently working with data center facility teams to address the rising temperatures. A shutdown has already occurred for some private clouds, and we expect that others will shut down as well. We recommend shutting down your VMware workload VMs for precaution so that recovery is safer. A shutdown of all systems started at 19:00 PDT [4:00 Local Time (GMT+2)]. We will notify you as soon as your Private Cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers are experiencing high temperatures and we are in the process of shutting them down. Customers may be unable to access their systems until we resolve the issue. Google Cloud NetApp Volumes Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 21:30 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers may have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and a recovery, we are shutting down all Private Clouds in this zone. BMS: Customers may have already lost connectivity to their BMS machines. As a protective measure for hardware integrity and a recovery, we are shutting down servers in this zone. Google Cloud NetApp Volumes Customers may have already lost connectivity to ONTAP clusters, or will lose connectivity to them shortly, as we proactively shut them down for their protection. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 04:17 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google has proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. The datacenter operator team is working diligently to bring cooling and power back online so we can safely restart affected workloads. GCVE: Our engineering teams have shut down private clouds, and we expect that others will shut down as well. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers are experiencing high temperatures and we are in the process of shutting them down. Customers may be unable to access their systems until we resolve the issue. Google Cloud NetApp Volumes Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 22:30 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and a recovery, we have shut down all private clouds in this zone. BMS: Customers may have already lost connectivity to their BMS machines. As a protective measure for hardware integrity and a recovery, we are shutting down some servers in this zone. Google Cloud NetApp Volumes Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down for their protection. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 04:41 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google has proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. The datacenter operator team is working diligently to bring cooling and power back online so we can safely restart affected workloads. Some cooling has been restored, and we are working to restore affected workloads as available capacity allows. GCVE: Our engineering teams have shut down private clouds to protect these clouds from any damage. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: Some Bare Metal Solution servers experienced high temperatures and we proactively shut them down. Customers may have been unable to access their systems, but impacted systems have now been restored. Google Cloud NetApp Volumes: Our engineering team has proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. There is no estimated time for resolution. We will provide an update by Wednesday, 2026-07-15 22:45 PDT with current details. We apologize to all who are affected by the disruption. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their BMS machines. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone, but the impacted servers have been restarted and should be functioning normally. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. Customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 06:29 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now working to safely restart affected workloads. GCVE: As a precautionary measure, our engineering teams had shut down private clouds to protect these clouds from any damage. Service restoration is still in progress. We will notify customers as soon as their private cloud has been powered back up and it is safe to restart the VMs. BMS: We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Our engineering team had proactively shut down ONTAP clusters to protect the data stored on them. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. We will provide an update by Thursday, 2026-07-16 00:30 PDT with current details. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone. We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 07:39 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now working to safely restart affected workloads. GCVE: As a precautionary measure, our engineering teams had shut down private clouds to protect these clouds from any damage. Network fabric has been restored, and Private Cloud restoration remains underway. We will notify affected customers once their Private Clouds are restored to allow for VM operational verification. BMS: We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Our engineering team had proactively shut down ONTAP clusters to protect the data stored on them. Recovery is currently in progress. Customers may experience unavailability of Cloud NetApp Volumes until this issue is resolved. We will provide an update by Thursday, 2026-07-16 01:30 PDT with current details. Customer symptoms: GCVE: Customers would have already observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we have shut down all private clouds in this zone. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we shut down some servers in this zone. We are continuing to restore servers and monitor their health. Customers may be unable to access these systems until service restoration is complete. Google Cloud NetApp Volumes: Customers would have already lost connectivity to ONTAP clusters, as we proactively shut them down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels are affected. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 08:32 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now validating site stability. GCVE: Network fabric has been restored, and Private Cloud restoration remains underway. We are notifying the affected customers as their Private Clouds are restored to allow for VM operational verification. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide an update by Thursday, 2026-07-16 02:30 PDT with current details. Customer symptoms: GCVE: Customers would have observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we had shut down all Private Clouds in this zone. We are in the process of bringing all restored Private Clouds online. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. Workaround: There are no workarounds available for this issue at this time. However, customers with multi-regional deployments are advised to route traffic to an alternate site.
- investigating · Jul 16, 2026, 09:21 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The datacenter operator team is now validating site stability. GCVE: Network fabric has been restored, and Private Cloud restoration remains underway. We are notifying the affected customers as their Private Clouds are restored to allow for VM operational verification. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide an update by Thursday, 2026-07-16 03:30 PDT with current details. Customer symptoms: GCVE: Customers would have observed a loss of connectivity to their private cloud. As a protective measure for hardware integrity and recovery, we had shut down all Private Clouds in this zone. We are in the process of bringing all restored Private Clouds online. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. Workaround: None at this time.
- investigating · Jul 16, 2026, 10:14 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes [Mitigated]: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. For Google Cloud NetApp Volumes and GCVE, if customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide the BMS restoration status update by Thursday, 2026-07-16 04:30 PDT with current details. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes [Mitigated]: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Workaround: None at this time.
- investigating · Jul 16, 2026, 11:39 AM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes [Mitigated]: Service restoration is complete, and all affected servers are now operational. We continue to monitor these for full service recovery. BMS: Server restoration is largely complete, with most systems now online and reporting a healthy status. We are actively working through the remaining validation efforts to achieve full recovery. For Google Cloud NetApp Volumes and GCVE, if customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We will provide the BMS restoration status update by Thursday, 2026-07-16 05:30 PDT with current details. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. We continue to recover the impact for BMS at the moment. GCVE [Mitigated]: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes [Mitigated]: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. Customers should now be able to access their volumes again. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. We are continuing to restore servers and monitor their health. Workaround: None at this time.
- resolved · Jul 16, 2026, 12:25 PM UTC
Description: The datacenter serving europe-west4-a for GCVE, BMS, and NetApp has experienced a power failure, which subsequently caused a cooling failure. Google proactively turned down workloads in order to protect customer data from any risks posed by running infrastructure in a high temperature environment. Cooling and power have been restored at the site. The issue with GCVE and Google Cloud NetApp Volumes has been resolved for all affected users as of Thursday, 2026-07-16 02:31 PDT and 01:00 PDT respectively. The issue with BMS is largely resolved and is believed to be affecting a very small number of customers. Our Engineering will continue to recover this residual impact directly with the impacted customers. If you have questions or are still impacted, please open a case with the Support Team and we will work with you until this issue is resolved. GCVE: Service restoration is complete across all the Private Clouds. Customers have been informed about this restoration and requested to verify that their VMs are fully operational. Google Cloud NetApp Volumes: Service restoration is complete, and all affected servers are now operational. BMS: Service restoration is largely complete. We continue working with a very small number of remaining affected customers to achieve full recovery. We thank you for your patience while we continue to fully resolve the issue. Customer symptoms: The issue is now resolved for GCVE and Google Cloud NetApp Volumes. The issue with BMS is largely resolved and our engineering will continue to recover this residual impact directly with the impacted customers. GCVE: Customers would have observed a loss of connectivity to their private cloud. Google Cloud NetApp Volumes: Customers would have lost connectivity to ONTAP clusters, as they were proactively shut down to protect these clusters from any damage. Only Standard, Premium, and Extreme service levels were affected. BMS: Customers may have lost connectivity to their servers. As a protective measure for hardware integrity and recovery, we had shut down some servers in this zone. Workaround: None at this time.
- resolved · Jul 18, 2026, 12:22 AM UTC
Google cloud vmware engine impact: - Start: 15 July 2026 17:09 - End: 16 July 2026 2:33 - Duration: 9 Hours, 24 Minutes Google cloud netapp volumes impact: - Start: 15 July 2026 16:39 - End: 16 July 2026 01:10 - Duration: 8 Hours 31 Minutes Bare metal solution impact: - Start: 15 July 2026 18:37 - End: 16 July 2026 07:34 - Duration: 12 Hours 57 Minutes Summary On Wednesday, 15 July 2026, Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud NetApp Volumes experienced service interruptions for a total duration of 14 hours, 55 minutes. We are taking immediate steps to ensure this doesn’t happen again. Preliminary Root Cause A regional data center hosting services in europe-west4-a experienced a loss of utility power and subsequent cooling capacity. The sequence of events leading to customer impact was as follows: - An electrical fault occurred on the utility grid upstream of the data center, disrupting the electrical distribution gear and cooling equipment. - The loss of cooling infrastructure resulted in ambient temperatures rising rapidly within the affected data halls. Host servers, storage clusters, and network switches were shut down to prevent equipment damages due to the extreme heat. - The high temperatures in the data hall resulted in disruption to customer workloads and control plane operations across the affected services. Google engineers have begun a full root cause analysis and we will provide additional information once it is available. Remediation Google engineering teams were alerted to the issue via automated temperature and hardware unreachability telemetry starting at 16:39 US/Pacific. Engineers collaborated with the third-party facility provider to safely restore primary utility power and cooling systems, returning ambient room temperatures to safe operational levels. With the environment stabilized, field support engineers and remote teams systematically booted and verified the server hosts, storage nodes, and network fabric in a controlled sequence. Automated recovery playbooks were executed to restore underlying network switches and routing infrastructure, allowing storage appliances and compute clusters to be brought back online and verified for health. The underlying infrastructure has been fully recovered, and normal operations have been successfully restored. Description of Impact On 15 July 2026 from 16:39 to 16 July 2026 07:34 US/Pacific, customers experienced service disruptions across several products in europe-west4-a zone: - Google Cloud VMware Engine: Customers lost connectivity to their private clouds and workloads as foundational hosts and network switches were powered off for thermal protection. - Bare Metal Solution: Customers experienced connectivity loss to their database servers and storage appliances as the underlying hardware was powered down. - Google Cloud NetApp Volumes: Customers in the STANDARD, PREMIUM, and EXTREME service levels were unable to access their storage volumes. Control plane operations, including the creation of new storage pools, volumes, and backups, experienced failures in the affected region.
- resolved · Jul 25, 2026, 01:16 PM UTC
Incident Report Summary On Wednesday, 15 July 2026, Google Cloud VMware Engine (GCVE), Bare Metal Solution (BMS), and Google Cloud NetApp Volumes (GCNV) experienced service interruptions for a total duration of 14 hours, 55 minutes. The root cause for this outage is a 3ms voltage drop in the power feed from the utility provider and subsequent utility breaker protective action. This incident was mitigated by the data center provider rectifying the failed systems followed by the Google engineering team restoring the services. Root Cause A regional data center hosting services in europe-west4-a experienced an upstream voltage transient affecting both utility power feeds A and B. During this event, the utility breakers on both A and B feeds tripped and initiated the transfer to the back-up power source DRUPS (Diesel Rotary Uninterruptible Power Supply). The transition of side B to DRUPS system was successful without any power interruption. The DRUPS back-up power system for side A failed to take over the facility load due to electrical component failures. The DRUPS failure to take over load initiated automatic transfer of the affected 3 rows from feed A to redundant power feed B. Rows 1 and 2 transferred to power feed B successfully. Row 3 failed to transfer to power feed B and experienced complete power loss due to an overload protection breaker trip. The root cause of the failed transfer on the affected row was identified as load deployment discrepancy which is under further investigation by Google engineering team. This resulted in loss of both redundant power feeds to the single row. During the voltage transient event, the server data hall experienced an increased temperature due to a cooling system failure. The chiller controller dropped offline during the voltage transient event, failing to signal the chilled water distribution pumps to restart and ultimately causing the chiller system A to shut down. The redundant source was not available due to known ongoing construction work at the facility. This resulted in the data hall temperatures reaching 44°C and subsequent shutdown of the affected data hall machines. Google engineering teams initiated machine shutdown procedures for the remainder of reachable devices as part of the cooling emergency shutdown process. A timeline of events during the incident is provided below. DataCenter Events | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:24 | An electrical fault occurred on the utility grid upstream of the data center, disrupting the electrical distribution. | | 07-15-2026 16:24 | DRUPS back-up power system for side A failed to take over the data hall load. | | 07-15-2026 16:24 | The chiller controller dropped offline during the voltage transient event causing distribution pumps to stop and unable to restart. | | 07-15-2026 16:37 | Rows 1 and 2 transferred to power feed B successfully. Row 3 failed to transfer to power feed B and lost power. | | 07-15-2026 18:29 | Data hall temperatures reached 44C and crossed the safe machine operating threshold. | | 07-15-2026 19:55 | Machine shutdown procedures implemented. | | 07-15-2026 21:05 | Cooling system fully recovered and temperatures in the data hall returned to normal operating range. | | 07-15-2026 21:24 | Notification about cooling recovery sent by provider | | 07-15-2026 21:46 | Notification about power recovery sent by provider | GCVE Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:30 | GCVE service power monitoring alert received | | 07-15-2026 16:41 | First symptom detected, servers reporting redundancy power feed failure. | | 07-15-2026 17:05 | Switch temperature >60°C alerts triggered. | | 07-15-2026 17:09 | Start of user impact, first prober alert failure for north south traffic for customers. | | 07-15-2026 19:00 | Server / Network devices shutdown initiated. | | 07-15-2026 19:55 | All reachable server/network devices were shut down. | | 07-15-2026 21:24 | Cooling system fully recovered and temperatures in the datahall were returning to normal operating range. | | 07-15-2026 21:56 | Network restoration started with reachable hydra devices. | | 07-15-2026 22:40 | Onsite technician arrived, to recover the console servers. | | 07-15-2026 23:10 | Console server reboot/recovery complete. | | 07-16-2026 00:33 | Network recovery for all Placement Groups complete. | | 07-16-2026 02:36 | Incident mitigated, after recovering all the customer PCs are fully healthy. | This outage impacted 24 private clouds of 20 distinct customers in europe-west4-a region. Bare Metal Solutions (BMS) Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:41 | First symptom detected, servers and storage reporting redundancy power feed failure | | 07-15-2026 17:52 | Automated monitoring detected rising temperatures | | 07-15-2026 18:37 | Four Netapp SAN storage nodes failed and were shut down due to overheating, resulting in storage availability issue | | 07-15-2026 18:37 | Customer impact started, first server shutdown detected | | 07-15-2026 18:59 | Reserve and buffer servers started to get powered off | | 07-15-2026 20:43 | Drop in the temperature has been detected | | 07-15-2026 20:52 | Four Netapp SAN storage nodes recovered, mitigating storage availability issue | | 07-15-2026 21:05 | The cooling system fully recovered and temperatures in the datahall were returning to normal operating range. | | 07-15-2026 23:23 | First customer server reboot started | | 07-16-2026 06:32 | Last customer server reboot started | | 07-16-2026 08:42 | Incident mitigated. All impacted customer servers were rebooted and confirmed in healthy state. | This outage impacted 9 distinct BMS customers in europe-west4 NetApp Timelines | Timestamp(PST) | Event Description | | :---- | :---- | | 07-15-2026 16:32 | Netapp facility remote monitoring alert on high temp and network switches switches failure received | | 07-15-2026 17:32 | All 6 clusters failed and were shut down automatically due to high temperature | | 07-15-2026 21:05 | Cooling capacity restored | | 07-15-2026 22:08 | Cluster recovery process initiated for all 6 clusters. 1st cluster recovered | | 07-15-2026 23:55 | All 6 Netapp Clusters and all customers recovered and validated as healthy & operational | Remediation and Prevention Google engineers were alerted to the infrastructure power loss on Wednesday, 15 July 2026 at 16:30 US/Pacific and subsequent increase in data hall temperatures at 17:44 US/Pacific via our automated monitoring and telemetry, and immediately began investigating. During the voltage transient event, the chillers maintained power but shut down because the distribution pumps failed to restart, resulting in no water flow. The pumps were manually switched from auto to hand mode to restore circulation and cooling. The facility team deployed an interim portable UPS to support the chiller controllers and prevent localized controller power loss. Upon confirmation of utility power restoration, the facility returned to utility power via automatic switching with the exception of two Remote Power Panels (RPPs), which required manual verification before restoration of power to affected server row. To provide full resiliency the facility team aligned a swing DRUPS unit to restore the redundant configuration on the A feed and is working on repairing the faulty DRUPS. To remediate the power loss at Row 3, once the electrical fault was confirmed to be fully isolated, teams reset the tripped breakers, successfully restoring both redundant power to the impacted server racks. Google is committed to preventing a repeat of this issue in the future and is completing the following actions: * Detailed investigation by the engineering team of the sequence of events that prevented transfer of load to DRUPS system and identified system improvements [ETA Aug 2026]. * Determine and resolve the cause of overload conditions that caused power loss to Row 3 [ETA Aug 2026]. * Perform investigation of chiller pump control system redundancy setup to ensure cooling system resiliency [ETA Sep 2026]. * Implement improvements to facility system monitoring alerts for power events and configure early alert thresholds for cooling excursion detection. [ETA Aug 2026]. * The GCVE engineering team is working to improve the automated triggering of shutdown during quickly evolving thermal runoff situations [ETA Oct 2026]. * The BMS engineering team is working with partner teams to update the incident classification and SLO definitions to improve personnel availability during major datacenter events [ETA Sep 2026]. * The GCNV engineering team is collaborate with the data center team to review incident handling SLA and runbooks, identify potential future occurrences and create playbooks to address/mitigate them, establish monthly joint emergency drill, and review if the Netapp cluster recovery process can be expedited [ETA Aug 2026]. Detailed Description of Impact On 15 July 2026 from 16:39 to 16 July 2026 07:34 US/Pacific, customers experienced service disruptions across several products in europe-west4-a zone: * Google Cloud VMware Engine: Customers lost connectivity to their private clouds and workloads as foundational hosts and network switches were powered off for thermal protection. * Bare Metal Solution: Customers experienced connectivity loss to their database servers and storage appliances as the underlying hardware was powered down. * Google Cloud NetApp Volumes: Customers in the STANDARD, PREMIUM, and EXTREME service levels were unable to access their storage volumes. Control plane operations, including the creation of new storage pools, volumes, and backups, experienced failures in the affected region.
Latest: Incident Report Summary On Wednesday, 15 July 2026, Google Cloud VMware Engine (GCVE), Bare Metal Solution (BMS), and Google Cloud NetApp Volumes (GCNV) experienced service interru…
-
- VMWare engineaustralia-southeast1australia-southeast2europe-west3northamerica-northeast2VMWare engine (australia-southeast1)VMWare engine (australia-southeast2)VMWare engine (europe-west3)VMWare engine (global)VMWare engine (northamerica-northeast2)
Timeline · 11 updates
- investigating · Jul 14, 2026, 08:24 PM UTC
Description: We are experiencing an issue with Google Cloud VMware Engine (GCVE) beginning Tuesday, 2026-07-14 at 10:00 PDT. We are continuing to investigate and mitigate the issue. We believe this disruption is isolated to network connectivity issues for stretch clusters, while Storage and Compute services appear to be unaffected. GCVE VMs are running as expected but customers may experience connectivity issues to the VMs. We will provide another update by Tuesday, 2026-07-14 14:00 PDT with current details. Customer symptoms: Some GCVE customers may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: None at this time.
- investigating · Jul 14, 2026, 09:31 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our preliminary investigation indicates this is stemming from an underlying network connectivity issue affecting the infrastructure that links the zones within a stretch cluster. This disruption is causing synchronization issues between the affected zones. We believe Storage and Compute services remain unaffected, and VMs are running as expected, though connectivity to them may be degraded. We will provide another update by Tuesday, 2026-07-14 15:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 14, 2026, 10:16 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our investigation has identified underlying inter-zone communication failures and Border Gateway Protocol (BGP) session flapping between cluster zones. Specifically, network connectivity has been lost between the affected zones and the witness appliance. Because the witness appliance is currently unreachable, the cluster zones are unable to safely synchronize state. As a result, VMs on the affected sites are becoming isolated and may be left without writable data. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 16:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 14, 2026, 11:05 PM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. Our investigation has identified a recent configuration update that is the likely cause of the inter-zone network disruption. Teams are working on remediation. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 17:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 15, 2026, 12:13 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 18:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Upon further investigation we identified that the northamerica-northeast2 region was not impacted. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 15, 2026, 01:15 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 19:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 15, 2026, 01:55 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 20:30 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following workarounds to restore access to your workloads: - VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Support before proceeding.
- investigating · Jul 15, 2026, 03:27 AM UTC
Description: We are experiencing an inter-site communication issue with Google Cloud VMware Engine (GCVE) stretched cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We have identified the customers that are affected by this issue and we are working with them on mitigation. A remediation rollout is currently in progress to address the underlying network issue. Failover / VM Migration: Migrating affected VMs to the healthy, secondary zone of your stretch cluster remains the primary mitigation strategy. Because of the complexities surrounding failover risks and secondary zone health, we highly encourage you to open a ticket with Google Cloud Support if you are severely impacted. We do not currently have an ETA for resolution. We will provide another update by Tuesday, 2026-07-14 22:00 PDT with current details. Customer symptoms: Some GCVE customers using Stretched Cluster may experience inter-site communication failures to their GCVE environments within the affected zones. Workaround: While we work on restoring full connectivity, we recommend the following to restore access to your workloads: * VM Migration (recommended): Where possible, migrate your affected VMs to the healthy and unaffected side of the stretch cluster. We strongly recommend consulting with Google Cloud Support before proceeding.
- resolved · Jul 15, 2026, 05:34 AM UTC
Description: We experienced an inter-site communication issue with Google Cloud VMware Engine (GCVE) Stretched Cluster customers beginning Tuesday, 2026-07-14 at 10:00 PDT. We identified the affected customers, and have worked with them to fully mitigate the issue by Tuesday, 2026-07-14 at 21:46 PDT. Preliminary analysis indicates that a network configuration update was the cause of the inter-zone network disruption. Our engineering team mitigated the issue by rolling back the faulty configuration to its last-known good value. If customers are still experiencing impact from this issue, please contact Support, and we will work with you to resolve any residual impact. We thank you for your patience while we worked to resolve this issue. Customer symptoms: Some GCVE customers using Stretched Cluster may have experienced inter-site communication failures to their GCVE environments within the affected zones. Workaround: The issue is now mitigated.
- resolved · Jul 20, 2026, 06:31 PM UTC
Preliminary Incident Report We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. We are working to address the root cause and prevent this from occurring in the future. Please note, this information is based on our best knowledge at the time of posting and is subject to change as our investigation continues. A final Incident Report with preventative actions will be posted once our investigation is complete. If you have experienced impact outside of what is listed below, please reach out to Google Cloud Support using https://cloud.google.com/support (https://cloud.google.com/support). Date/Time of the Issue (All time US/Pacific) Incident Start: 14 July 2026 10:00 Incident End: 14 July 2026 20:40 Duration: 10 hours, 40 minutes Summary On Tuesday, 14 July 2026, Google Cloud VMware Engine (GCVE) Stretched Cluster customers in the australia-southeast2 and europe-west3 zones experienced inter-site communication failures. The disruption was traced to a network configuration update that introduced a conflict, causing inter-site communication failures, which triggered VMware Stretch Cluster failover events. Google engineers successfully mitigated the disruption by rolling back the configuration change. Preliminary Root Cause A configuration change deployed within the Google Cloud network affected traffic between the VMware Engine stretched cluster zones. This resulted in a loss of connectivity between zones in the stretched cluster deployment. Google engineers are doing a full root cause analysis and will provide additional information once it is available. Remediation To stabilize the environment, engineers identified the working network paths and deployed configuration changes to reroute traffic and restore connectivity. GCVE stretch cluster inter-zonal connectivity was completely restored for all supported locations on Tuesday, 14 July 2026 at 20:40 US/Pacific. Description of Impact On Tuesday, 14 July 2026 from 10:00 to 20:40 US/Pacific, customers utilizing GCVE stretch clusters in the affected zones (australia-southeast2, and europe-west3) experienced inter-site communication failures. For some customers, depending on their architecture, this disruption led to VMWare HA event causing VM restarts/movement across zones as designed, Host disconnects, VSAN alarms and Intermittent access to VMware Management (vCenter/NSX Manager) components. ---
- resolved · Jul 24, 2026, 07:10 AM UTC
Incident Report Summary On Tuesday, 14 July 2026 10:00 PT, Google Cloud VMware Engine (GCVE) Stretched Cluster customers in the australia-southeast2 and europe-west3 zones experienced inter-site communication failures. The disruption was traced to a network configuration update that introduced a conflict, causing inter-site communication failures, which triggered VMware Stretched Cluster failover events. Google engineers successfully mitigated the impact by rolling back the issue-causing configuration change and resetting the network state. We sincerely apologize for the disruption this incident caused to your business. We know how much you rely on Google Cloud, and we regret the impact on your productivity. We are working to address the root cause and prevent this from occurring in the future. Root Cause A network configuration update intended to prepare the cloud network infrastructure for new capabilities was deployed to the foundational network control plane. While the configuration payload itself was structurally valid, it exposed an implementation gap within the control plane's routing logic. This logical gap caused the underlying network hosts to misconfigure program routing tables. As a result, traffic destined for the private IP address space used by GCVE Stretched Clusters was dropped. Because Stretched Clusters rely on this private address space to establish routing sessions for inter-zonal connectivity, the traffic drops severed communications between the active zones of the clusters, triggering VMware High Availability (HA) failovers. Standard routing health-checking protocols, such as Border Gateway Protocol (BGP) and Bidirectional Forwarding Detection (BFD), remained fully functional because their control plane sessions run on separate, unaffected address spaces. Because the control plane remained healthy, standard failover mechanisms failed to detect that the selective private IP range used for inter-zonal data tunneling was being dropped. Automated safeguards did not block the deployment because the configuration passed initial payload validations. The impact only manifested once the update began routing data traffic through the specific affected IP range. Remediation and Prevention To stabilize the environment, engineers identified the working network paths and deployed configuration changes to reroute traffic and restore connectivity. GCVE Stretch Cluster inter-zonal connectivity was completely restored for all supported locations on Tuesday, 14 July 2026 at 20:40 US/Pacific. Google is committed preventing a repeat of this issue in the future and is completing the following actions: * Expanded Testing: We are adding more detailed GCVE network setups to our existing testing environments. This allows us to automatically test future network updates against these configurations before they go live. * Service-Level Data Path Failover: We are implementing additional service-level data path failover mechanisms that actively probe the specific data-tunneling traffic space. This will ensure a path failover is triggered if the data plane itself is degraded even when the BGP control plane remains functional. * Detailed Alerting: We are adding faster, more specific alerts for connection issues between zones. This builds on our current platform monitoring to catch minor disruptions early and speed up our response. * Improved Cluster Resilience: We are fine-tuning the cluster's high-availability and storage settings. This makes virtual machines more resilient to short network drops, preventing them from restarting unnecessarily if the main site is still healthy. * Workload Resilience Alignment (Shared Responsibility): We are proactively reaching out to customers utilizing non-vSAN replicated virtual machine configurations within Stretched Clusters. Because these workloads are pinned to a single zone without active cross-site replication, they cannot survive inter-site network disruptions. We are ready to assist customers in auditing their storage policies, adjusting Stretched Cluster configurations, and planning the secondary zone capacity required to enable robust high-availability failovers. Detailed Description of Impact On Tuesday, 14 July 2026 from 10:00 to 20:40 US/Pacific, customers utilizing GCVE Stretch Clusters in the affected zones (australia-southeast2, and europe-west3) experienced inter-site communication failures. For some customers, depending on their architecture, this disruption led to a VMWare HA event causing VM restarts/movement across zones as designed, host disconnects, VSAN alarms and intermittent access to VMware Management (vCenter/NSX Manager) components.
Latest: Incident Report Summary On Tuesday, 14 July 2026 10:00 PT, Google Cloud VMware Engine (GCVE) Stretched Cluster customers in the australia-southeast2 and europe-west3 zones experien…
-
- Hybrid ConnectivityMedia CDNVirtual Private Cloud (VPC)asia-south2globalHybrid Connectivity (asia-south2)Hybrid Connectivity (global)Media CDN (asia-south2)Media CDN (global)Virtual Private Cloud (VPC) (asia-south2)
Timeline · 9 updates
- investigating · Jun 10, 2026, 01:13 AM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. We are investigating additional traffic mitigations and Internet Edge peering augmentation to alleviate the latency issues affecting our customers. We will provide our next update by Wednesday, 2026-06-10 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 10, 2026, 10:25 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. We are investigating additional traffic mitigations and Internet Edge peering augmentation to alleviate the latency issues affecting our customers. We are continuing to work with the ISP partners in the region to mitigate any additional impact from unplanned failures. We will provide our next update by Thursday, 2026-06-11 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 11, 2026, 11:25 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Initial traffic mitigations have yielded positive results for some Cloud customers. In parallel, we are pursuing additional Internet Edge peering capacity to reduce existing fragility in the metro. We are also optimizing capacity across network backbones to increase additional headroom for VPC customers in the affected region. Additionally, we are planning to augment our local Delhi POP and migrating select peering partners to further increase regional capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Friday, 2026-06-12 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 12, 2026, 10:50 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Initial traffic mitigations have yielded positive results for some Cloud customers. In parallel, we are pursuing additional Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are augmenting out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India (expected to be done by Wednesday, 2026-06-17 PDT). We have optimized capacity across network backbones to increase available headroom. Additionally, we are further augmenting our Delhi backbone capacity (expected to be complete by Monday, 2026-06-15 PDT). We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-15 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 15, 2026, 11:11 PM UTC
Description: A fire at a third-party data center facility required an emergency power shutdown of networking equipment, isolating a non-compute local Point of Presence (POP) in Delhi and reducing available network capacity in the metro area. We rerouted significant traffic from the impacted facility in Delhi to address reduced local serving capabilities. As a result, a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers may be impacted by the routing changes made to address reduced local, latency-optimized serving capabilities in Delhi. Affected customers may experience intermittent latency spikes due to demand exceeding capacity across Indian metros and regional ISPs. Media CDN customers may have experienced higher latencies than normal. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are augmenting out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India (expected to be done by Wednesday, 2026-06-17 PDT). We have optimized capacity across network backbones to increase available headroom. Additionally, we have augmented our Delhi backbone capacity over the weekend. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Wednesday, 2026-06-17 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 17, 2026, 10:36 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Further, we are nearly finished with the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. We have optimized capacity across network backbones to increase available headroom. Additionally, we have augmented our Delhi backbone capacity. We have also restored additional capacity between Delhi-Chennai and Delhi-Mumbai. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-22 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 22, 2026, 11:51 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a large portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Since the last update, we have completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Following safety clearance, teams obtained access to the damaged site and will further restore additional incremental user-facing backbone capacity on Tuesday, 2026-06-23. We have optimized capacity across network backbones to increase available headroom, and augmented our Delhi user-facing backbone capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Tuesday, 2026-06-23 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- investigating · Jun 23, 2026, 10:52 PM UTC
Description: Traffic rerouting from the impacted Delhi facility has caused a subset of Hybrid Connectivity and Virtual Private Cloud (VPC) customers to experience intermittent latency spikes as demand exceeds regional capacity. Media CDN customers may also notice increased latencies. Initial traffic mitigations have yielded positive results for some Cloud customers. We have restored a large portion of Internet Edge peering capacity to reduce latency in the local Delhi metropolitan area. Since the last update, we have completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Following safety clearance, our team has accessed the damaged site and is continuing to restore additional capacity throughout this week. We have optimized capacity across network backbones to increase available headroom and augmented our Delhi user-facing backbone capacity. We will continue to closely monitor latency deviations and packet drops. We will provide our next update by Monday, 2026-06-29 at 17:00 PDT. Symptoms: Customers may experience slightly elevated latency and non-optimal network routing into Google Cloud until the affected facility is fully restored. Workaround: There is no workaround at this time.
- resolved · Jun 29, 2026, 11:06 PM UTC
Description: Traffic rerouting from the impacted Delhi facility caused a subset of Hybrid Connectivity, Virtual Private Cloud (VPC) and Media CDN customers to experience intermittent latency spikes as demand exceeded regional capacity. We completed the augmentation of out-of-region Internet Edge regional peering capacity in Chennai to provide additional load-balancing and redundancy to large ISPs in India. Service to a large portion of Internet Edge peering capacity has been restored to reduce latency in the local Delhi metropolitan area. We are now recovered and returned to normal service as of Friday, 2026-06-26 PDT. Following safety clearance, our team restored all lost capacity. We have restored capacity between Delhi-Chennai and Delhi-Mumbai and will continue to closely monitor latency deviations and packet drops. We thank you for your patience during the resolution of this issue. Symptoms: The impacted customers may have experienced slightly elevated latency and non-optimal network routing into Google Cloud. Workaround: None
Latest: Description: Traffic rerouting from the impacted Delhi facility caused a subset of Hybrid Connectivity, Virtual Private Cloud (VPC) and Media CDN customers to experience intermitte…
-
- Started Jul 15, 2026, 11:57 PM UTC · Resolved Jul 16, 2026, 12:25 PM UTC · 12h 28m
- Incident affecting VMWare engine ResolvedStarted Jul 14, 2026, 05:00 PM UTC · Resolved Jul 15, 2026, 03:40 AM UTC · 10h 40m
- Started Jun 05, 2026, 07:00 AM UTC · Resolved Jun 26, 2026, 07:00 PM UTC · 21d 12h