Hetzner had 67 outages in the last 2 years totaling 178h 29m of downtime — averaging 2.8 incidents per month.

There were 67 Hetzner outages since April 9, 2025 totaling 178h 29m of downtime. Each is summarised below — incident details, duration, and resolution information.

Source: https://status.hetzner.com

Minor June 16, 2026

Urgent maintenance on Load Balancers in ASH, HIL & SIN

Detected by Pingoru
Jun 16, 2026, 04:04 PM UTC
Resolved
Jun 16, 2026, 04:11 PM UTC
Duration
7m
Affected: Cloud (Load Balancer)
Timeline · 1 update
  1. resolved Jun 16, 2026, 04:11 PM UTC

    We will perform urgent maintenance on the Load Balancers in ASH, HIL & SIN. During this maintenance period, the Load Balancers will not be available for a short time. We expect the downtime for the Load Balancers to last only a few seconds per load balancer.

Read the full incident report →

Minor June 16, 2026

Maintenance at nic.at

Detected by Pingoru
Jun 16, 2026, 04:00 PM UTC
Resolved
Jun 16, 2026, 08:16 PM UTC
Duration
4h 16m
Affected: Panels (Robot)
Timeline · 2 updates
  1. scheduled Jun 16, 2026, 07:43 AM UTC

    The .at registry (nic.at) will do routine maintenance work during the mentioned period. So you will not be able to order .at domains during that time.

  2. identified Jun 16, 2026, 04:15 PM UTC

    The .at registry (nic.at) will do routine maintenance work during the mentioned period. So you will not be able to order .at domains during that time.

Read the full incident report →

Minor June 16, 2026

Load Balancers: maintenance work

Detected by Pingoru
Jun 16, 2026, 07:00 AM UTC
Resolved
Jun 16, 2026, 08:00 AM UTC
Duration
1h
Affected: Cloud (Load Balancer)
Timeline · 2 updates
  1. scheduled Jun 11, 2026, 01:37 PM UTC

    We will be performing routine maintenance work on Load Balancers in ASH & HIL. During this maintenance work, there may be a short connection loss from the active connections (TCP and HTTP) to the Load Balancers, or from the Load Balancers to their targets.

  2. identified Jun 16, 2026, 06:59 AM UTC

    We will be performing routine maintenance work on Load Balancers in ASH & HIL. During this maintenance work, there may be a short connection loss from the active connections (TCP and HTTP) to the Load Balancers, or from the Load Balancers to their targets.

Read the full incident report →

Minor June 14, 2026

Cloud Leaf fault fsn1-cloud2-leaf51

Detected by Pingoru
Jun 14, 2026, 10:29 AM UTC
Resolved
Jun 14, 2026, 11:26 AM UTC
Duration
57m
Affected: Cloud
Timeline · 1 update
  1. resolved Jun 14, 2026, 11:26 AM UTC

    We are currently experiencing a fault on our cloud leaf fsn1-cloud2-leaf51. Our technicians are working hard on analyzing the cause of the interruption in order to solve the issue. Please bear with us. As soon as more information is available, we shall inform you via this website. We apologize for any inconvenience. Thank you for your understanding.

Read the full incident report →

Minor June 12, 2026

Load Balancers: BGP connection interruption in the FSN1 Cluster LB06

Detected by Pingoru
Jun 12, 2026, 10:48 PM UTC
Resolved
Jun 12, 2026, 11:35 PM UTC
Duration
47m
Affected: Cloud (Load Balancer)
Timeline · 2 updates
  1. identified Jun 12, 2026, 11:18 PM UTC

    A BGP connection was interrupted on a load balancer host at the FSN1 location. As a result, the load balancers on this node were unreachable for three to five minutes, and existing connections were interrupted.

  2. resolved Jun 12, 2026, 11:35 PM UTC

    A BGP connection was interrupted on a load balancer host at the FSN1 location. As a result, the load balancers on this node were unreachable for three to five minutes, and existing connections were interrupted.

Read the full incident report →

Minor June 11, 2026

Maintenance work on billing functions and consumption data

Detected by Pingoru
Jun 11, 2026, 08:00 PM UTC
Resolved
Jun 11, 2026, 08:12 PM UTC
Duration
12m
Timeline · 2 updates
  1. scheduled Jun 11, 2026, 06:53 AM UTC

    During this time, we will be doing routine maintenance work which is why the following functions are temporarily not available: - Accounts - view/edit contact details - view/pay invoices - view transactions - view/edit payment details - Activate Vouchers - Robot - server transfer - storagebox transfer - Detailed invoice view (https://usage.hetzner.com)

  2. resolved Jun 11, 2026, 08:12 PM UTC

    During this time, we will be doing routine maintenance work which is why the following functions are temporarily not available: - Accounts - view/edit contact details - view/pay invoices - view transactions - view/edit payment details - Activate Vouchers - Robot - server transfer - storagebox transfer - Detailed invoice view (https://usage.hetzner.com)

Read the full incident report →

Minor June 11, 2026

Maintenance emergency power system in HEL1-DC1

Detected by Pingoru
Jun 11, 2026, 06:35 AM UTC
Resolved
Jun 11, 2026, 10:38 AM UTC
Duration
4h 3m
Affected: HEL1 (HEL1-DC1)
Timeline · 1 update
  1. identified Jun 11, 2026, 06:37 AM UTC

    We will perform routine maintenance work on our emergency power systems. Due to the redundant design of our power supply systems, we do not expect any issues.

Read the full incident report →

Minor June 9, 2026

Cloud Leaf fault nbg1-cloud1-leaf124

Detected by Pingoru
Jun 09, 2026, 10:12 AM UTC
Resolved
Jun 09, 2026, 10:21 AM UTC
Duration
9m
Affected: Cloud
Timeline · 1 update
  1. resolved Jun 09, 2026, 10:21 AM UTC

    We are currently experiencing a fault on our cloud leaf nbg1-cloud1-leaf124. Our technicians are working hard on analyzing the cause of the interruption in order to solve the issue. Please bear with us. As soon as more information is available, we shall inform you via this website. We apologize for any inconvenience. Thank you for your understanding.

Read the full incident report →

Minor June 5, 2026

Maintenance emergency power system in DC9

Detected by Pingoru
Jun 05, 2026, 04:00 AM UTC
Resolved
Jun 05, 2026, 11:03 AM UTC
Duration
7h 3m
Affected: HEL1 (HEL1-DC9)
Timeline · 3 updates
  1. scheduled Jun 01, 2026, 10:23 AM UTC

    We will perform routine maintenance work on our emergency power systems. Due to the redundant design of our power supply systems, we do not expect any issues.

  2. scheduled Jun 03, 2026, 12:14 PM UTC

    We will perform routine maintenance work on our emergency power systems. Due to the redundant design of our power supply systems, we do not expect any issues.

  3. identified Jun 05, 2026, 05:10 AM UTC

    We will perform routine maintenance work on our emergency power systems. Due to the redundant design of our power supply systems, we do not expect any issues.

Read the full incident report →

Minor June 3, 2026

Maintenance work on abuse system

Detected by Pingoru
Jun 03, 2026, 04:30 AM UTC
Resolved
Jun 03, 2026, 05:07 AM UTC
Duration
37m
Timeline · 2 updates
  1. scheduled Jun 02, 2026, 11:15 AM UTC

    In the mentioned period, we will be performing routine maintenance work on the abuse system. So we will not be able to process abuse tickets during that time, and you will not be able to use our abuse form.

  2. identified Jun 03, 2026, 04:29 AM UTC

    In the mentioned period, we will be performing routine maintenance work on the abuse system. So we will not be able to process abuse tickets during that time, and you will not be able to use our abuse form.

Read the full incident report →

Minor June 1, 2026

Backbone connection fault between Frankfurt - Falkenstein

Detected by Pingoru
Jun 01, 2026, 03:34 PM UTC
Resolved
Jun 01, 2026, 06:43 PM UTC
Duration
3h 9m
Affected: Network (Backbone)
Timeline · 2 updates
  1. identified Jun 01, 2026, 04:22 PM UTC

    We are currently experiencing a fault in the backbone connection between Frankfurt and Falkenstein. This may lead to brief latency issues. Please bear with us. As soon as more information is available, we will post it here. We apologize for any inconvenience. Thank you for your understanding.

  2. monitoring Jun 01, 2026, 05:14 PM UTC

    We are currently experiencing a fault in the backbone connection between Frankfurt and Falkenstein. This may lead to brief latency issues. Please bear with us. As soon as more information is available, we will post it here. We apologize for any inconvenience. Thank you for your understanding.

Read the full incident report →

Minor June 1, 2026

Discontinued support for operating system openSUSE 15.6

Detected by Pingoru
Jun 01, 2026, 11:00 AM UTC
Resolved
Jun 01, 2026, 03:30 PM UTC
Duration
4h 30m
Timeline · 1 update
  1. investigating Jun 01, 2026, 09:45 AM UTC

    Since the official support for the operating system is very limited / is no longer available, we will discontinue support for the image openSUSE 15.6 and we will remove it from our official product portfolio beginning on March 13th 2026. If you still need this image, you will still be able to find it until further notice in the "old_images" section of our Installimage script. You can find a guide to Installimage on Hetzner Docs here: https://docs.hetzner.com/robot/dedicated-server/operating-systems/installimage Important note: The operating systems in the "old_images" folder will not receive any updates from Hetzner Online, nor will we be able to offer any technical support for them.

Read the full incident report →

Minor May 31, 2026

Object Storage in location fsn1 degraded

Detected by Pingoru
May 31, 2026, 05:25 AM UTC
Resolved
Jun 02, 2026, 06:25 AM UTC
Duration
2d 1h
Affected: Cloud (Object Storage)
Timeline · 2 updates
  1. investigating May 31, 2026, 05:26 AM UTC

    Creating new buckets and credentials in the fsn1 location can be delayed.

  2. monitoring Jun 01, 2026, 01:09 PM UTC

    Creating new buckets and credentials in the fsn1 location can be delayed.

Read the full incident report →

Minor May 29, 2026

Object Storage in location nbg1 degraded

Detected by Pingoru
May 29, 2026, 07:27 PM UTC
Resolved
May 29, 2026, 08:20 PM UTC
Duration
52m
Affected: Cloud (Object Storage)
Timeline · 2 updates
  1. investigating May 29, 2026, 07:27 PM UTC

    Object Storage service in location nbg1 is currently degraded. Requests may fail or time out. We are currently investigating the issue.

  2. monitoring May 29, 2026, 08:04 PM UTC

    Object Storage service in location nbg1 is currently degraded. Requests may fail or time out. We are currently investigating the issue.

Read the full incident report →

Minor May 27, 2026

Maintenance on router nbg1-core12

Detected by Pingoru
May 27, 2026, 07:00 AM UTC
Resolved
May 28, 2026, 09:37 AM UTC
Duration
1d 2h
Affected: Datacenter (Network-NBG1)
Timeline · 4 updates
  1. scheduled May 20, 2026, 08:48 AM UTC

    Maintenance work will be carried out on the nbg1-core12 router during the above-mentioned period. Due to our redundant setup, there should be no disruptions. If you are a customer of a redundant uplink in colocation, one side of the uplink will fail. Please check the function of the redundancy before maintenance.

  2. identified May 27, 2026, 07:12 AM UTC

    Maintenance work will be carried out on the nbg1-core12 router during the above-mentioned period. Due to our redundant setup, there should be no disruptions. If you are a customer of a redundant uplink in colocation, one side of the uplink will fail. Please check the function of the redundancy before maintenance.

  3. investigating May 27, 2026, 02:50 PM UTC

    Maintenance work will be carried out on the nbg1-core12 router during the above-mentioned period. Due to our redundant setup, there should be no disruptions. If you are a customer of a redundant uplink in colocation, one side of the uplink will fail. Please check the function of the redundancy before maintenance.

  4. identified May 28, 2026, 07:23 AM UTC

    Maintenance work will be carried out on the nbg1-core12 router during the above-mentioned period. Due to our redundant setup, there should be no disruptions. If you are a customer of a redundant uplink in colocation, one side of the uplink will fail. Please check the function of the redundancy before maintenance.

Read the full incident report →

Minor May 20, 2026

UPS function tests in HEL1-DC9

Detected by Pingoru
May 20, 2026, 06:00 AM UTC
Resolved
May 20, 2026, 08:03 AM UTC
Duration
2h 3m
Affected: HEL1 (HEL1-DC9)
Timeline · 2 updates
  1. scheduled May 19, 2026, 08:29 AM UTC

    We will do routine function tests on our UPS systems. Due to the redundant design of our power supply systems, we do not expect any issues.

  2. identified May 20, 2026, 06:11 AM UTC

    We will do routine function tests on our UPS systems. Due to the redundant design of our power supply systems, we do not expect any issues.

Read the full incident report →

Major May 19, 2026

Rescue system login with SSH key does not work

Detected by Pingoru
May 19, 2026, 09:45 AM UTC
Resolved
May 20, 2026, 07:18 AM UTC
Duration
21h 33m
Affected: Cloud (Cloud Server)
Timeline · 1 update
  1. identified May 19, 2026, 03:47 PM UTC

    Currently, there are problems with SSH key login in the rescue system. If you select an SSH key when you enable the rescue system, it can happen that the SSH key nonetheless is not set up in the rescue system. Log in to the rescue system with ssh key is then not possible.

Read the full incident report →

Minor May 19, 2026

Maintenance Activities

Detected by Pingoru
May 19, 2026, 06:00 AM UTC
Resolved
May 19, 2026, 12:17 PM UTC
Duration
6h 17m
Affected: Cloud
Timeline · 2 updates
  1. scheduled May 18, 2026, 12:15 PM UTC

    We will be performing maintenance during the specified time. During this period, there may be brief interruptions or limited availability of the API.

  2. identified May 19, 2026, 07:47 AM UTC

    We will be performing maintenance during the specified time. During this period, there may be brief interruptions or limited availability of the API.

Read the full incident report →

Minor May 19, 2026

Maintenance UPS systems in HEL1-DC9

Detected by Pingoru
May 19, 2026, 05:00 AM UTC
Resolved
May 20, 2026, 08:03 AM UTC
Duration
1d 3h
Affected: HEL1 (HEL1-DC9)
Timeline · 2 updates
  1. scheduled May 18, 2026, 01:00 PM UTC

    We will perform routine maintenance work on our UPS systems. Due to the redundant design of our power supply systems, we do not expect any issues.

  2. identified May 19, 2026, 05:05 AM UTC

    We will perform routine maintenance work on our UPS systems. Due to the redundant design of our power supply systems, we do not expect any issues.

Read the full incident report →

Minor May 18, 2026

Hetzner Accounts routine maintenance work

Detected by Pingoru
May 18, 2026, 07:30 PM UTC
Resolved
May 18, 2026, 07:56 PM UTC
Duration
26m
Affected: Panels (Accounts)
Timeline · 2 updates
  1. scheduled May 18, 2026, 12:02 PM UTC

    During this time, we will be doing routine maintenance work on Hetzner Accounts (https://accounts.hetzner.com). You will not have access to Hetzner Accounts or these other user interfaces: - Hetzner Console (https://console.hetzner.com) - Robot (https://robot.hetzner.com) - konsoleH (https://konsoleh.hetzner.com) - DNS Console (https://dns.hetzner.com)

  2. identified May 18, 2026, 07:30 PM UTC

    During this time, we will be doing routine maintenance work on Hetzner Accounts (https://accounts.hetzner.com). You will not have access to Hetzner Accounts or these other user interfaces: - Hetzner Console (https://console.hetzner.com) - Robot (https://robot.hetzner.com) - konsoleH (https://konsoleh.hetzner.com) - DNS Console (https://dns.hetzner.com)

Read the full incident report →

Minor May 18, 2026

Robot routine maintenance work

Detected by Pingoru
May 18, 2026, 07:30 PM UTC
Resolved
May 18, 2026, 07:56 PM UTC
Duration
26m
Affected: Panels (Robot)
Timeline · 2 updates
  1. scheduled May 18, 2026, 12:00 PM UTC

    During this time, we will be doing routine maintenance work on Robot. You will not have access to Robot or these other user interfaces: - Robot (https://robot.hetzner.com) - Robot Web Service (https://robot-ws.your-server.de) - Robot Mobile - Robot Email Interface

  2. identified May 18, 2026, 07:31 PM UTC

    During this time, we will be doing routine maintenance work on Robot. You will not have access to Robot or these other user interfaces: - Robot (https://robot.hetzner.com) - Robot Web Service (https://robot-ws.your-server.de) - Robot Mobile - Robot Email Interface

Read the full incident report →

Minor May 12, 2026

Maintenance emergency power system in HEL1-DC5

Detected by Pingoru
May 12, 2026, 04:00 AM UTC
Resolved
May 12, 2026, 12:43 PM UTC
Duration
8h 43m
Affected: HEL1 (HEL1-DC5)
Timeline · 1 update
  1. identified May 12, 2026, 03:59 AM UTC

    We will perform routine maintenance work on our emergency power systems. Due to the redundant design of our power supply systems, we do not expect any issues.

Read the full incident report →

Minor May 12, 2026

Maintenance at backbone connection between Falkenstein - Frankfurt

Detected by Pingoru
May 12, 2026, 12:00 AM UTC
Resolved
May 12, 2026, 05:34 AM UTC
Duration
5h 34m
Affected: Network (Backbone)
Timeline · 1 update
  1. investigating May 07, 2026, 01:44 PM UTC

    In the above-mentioned period, maintenance will be performed at the backbone connection between Falkenstein - Frankfurt This may lead to brief latency issues. We apologize for any inconvenience. Thank you for your understanding.